Çoker, G B (1985) Information System for Building Products. Journal of Construction Engineering and Management, 111(04), 411–25.

Ahuja, H N and Nandakumar, V (1985) Simulation Model to Forecast Project Completion Time. Journal of Construction Engineering and Management, 111(04), 325–42.

  • Type: Journal Article
  • Keywords: Computer aided simulation; Construction management; Scheduling; Simulation models;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1985)111:4(325)
  • Abstract:
    Project cost is most sensitive to its schedule. The construction project environment comprising dynamic, uncertain, but predictable, variables such as weather, space congestion, workmen absenteeism, etc., is changing continuously, affecting activity durations. The reliability of project duration forecast can be enhanced by an explicit analysis to determine the variation in activity durations caused by the dynamic variables. A computer model is used to simulate the expected occurrence of the uncertainty variables. From the information that is collected normally for a progress update of the tactical plan and by simulating the project environment, the combined impact of the uncertainty variables is predicted for each progress period. By incorporating the combined impact in the duration estimates of each activity, the new activity duration distribution is generated. From these activity duration distributions, the probability of achieving the original project completion time and of completing the project at any other time is computed.

Ayyub, B M and Haldar, A (1985) Decisions in Construction Operations. Journal of Construction Engineering and Management, 111(04), 343–57.

Chang, L and Borcherding, J D (1985) Evaluation of Craftsman Questionnaire. Journal of Construction Engineering and Management, 111(04), 426–37.

Easa, S M and Can, E K (1985) Stochastic Priority Model for Aggregate Blending. Journal of Construction Engineering and Management, 111(04), 358–73.

Farid, F and Boyer, L T (1985) Fair and Reasonable Markup (FaRM) Pricing Model. Journal of Construction Engineering and Management, 111(04), 374–90.

O'Connor, J T (1985) Impacts of Constructability Improvement. Journal of Construction Engineering and Management, 111(04), 404–10.

Ringwald, R C (1985) Formwork Design. Journal of Construction Engineering and Management, 111(04), 391–403.